Answer:
9.08 hours
Step-by-step explanation:
in order to fill 1 pool
fill rate by pipe = 1 pool / 15 hours = 1/15 pool per hour
fill rate by hose = 1 pool / 23 hours = 1/23 pool per hour
combined rate = fill rate by pipe + fill rate by pool
= 1/15 + 1/23 = 38/345 pool per hour
since:
38/345 pool -----------> will take 1 hour
1 pool --------------------> will take 1 hour x (345/38) = 9.08 hours
Answer:
C
Step-by-step explanation:
Answer:
Step-by-step explanation:
Im sorry i dont really know ur anwer. Hope someone else can
Answer: y = 150 + 2.75x
Step-by-step explanation:
Since we are informed that the installation fee is $150.00 and that the tile is priced at $2.75 per square foot, x, the total cost, y, of the backsplash will be the addition of the fixed cost of $150.00 plus $2.75 multiplied by the number of square foot. This will be expressed as:
y = 150 + 2.75x
where,
x = number of square foot.
It would convert into a whole number so if you have to put it in decimal form it would look like this:
8.0