Answer:
When the Italian explorer Christopher Columbus inadvertently discovered the Americas, it became known as the New World.
In a series of activities which were mostly commercial in nature for the benefit of Europe, crops (such as sugar, tobacco, chocolate, and potatoes), animals (such as horses), European culture, human populations (both slaves and colonial masters), technology, diseases, and new ways of doing things were exchanged between the "New World" and the "Old World"
In order to make for smooth colonial administration between the African leaders and the Colonial masters, African leaders were bribed with textiles, rum and manufactured goods from Europe.
Slaves were transported from Africa to the Americas to work on plantations of sugar , tobacco and cotton which were then transported to Europe.
This trade is what came to be referred to as the Columbian Exchange.
Europe is said to have benefited more from the Colombian Trade, as there has been a huge shift of resources to Europe , especially gold and silver from the New World and other regions.
Cheers
Answer:
I need something to choose from to answer your question
Explanation:
Answer:
C the September 11 ,2001 terrorist attacks
Answer:
The answer is below
Explanation:
During the project life cycle before final completion, there are various stages involved, and each of these stages are packed with their challenges that may sometimes cause the failure of the project completion, either causing delays, or sometimes outright abandonment of the project.
Hence, the needs the look for the potential signs if a current project is experiencing issues, so as to solve them, and eliminate the issues immediately.
Some of the signs to be identified if a current projects is experiencing issues are:
1. The mapped out project duration is not being followed or overlapped
2. The actual or running cost of project execution is going beyond the budgeted cost of the project in each stage of the project.
3. The vital cog personnels to the project are leaving before their expected exits.
4. Decision makers are found wanting, during project meetings and critical path decision periods.
5. The vital parts of the projects are getting delayed in execution.
6. Low or under funding of the project.