1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
jek_recluse [69]
2 years ago
6

i will give 1534!!!!A CFL factory uses 24325.208 L of water in 4 hours. How much water does the factory use in 3 hours?

Mathematics
1 answer:
Alla [95]2 years ago
8 0

Answer:

18243.906

Step-by-step explanation:

24325.208 / 4= 6081.302

meaning 1 hour is 6081.302

so 3 hours is 6081.302*3= 18243.906

You might be interested in
A cable television compan is laying cable in an area with underground utilities. Two subdivisions are located on opposite sides
Schach [20]

Answer:

Step-by-step explanation:

Given:

Point Q = Q is on the north bank 1200 m east of P $40/m to lay cable underground and $80/m way to lay the cable.

Lets denote T be a point on north bank, therefore, point T is t m east and 100m north of P.

Note that 0 < t < 1200

Distance from P to T using Pythagoras theorem:

PT^2 = PQ^2 + QT^2

PT = √(t²+100²) = √(t²+10,000)

Distance from T to Q:

TQ = 1200 - t

From above, Cable from P to T is underwater, and costs $80/m to lay.

Cable from T to Q is underground, and costs $40/m to lay.

Total cost of the cable:

C(t) = 80√(t²+10,000) + 40(1200 - t)

Cost is at its minimum: when dC/dt = C'(t) = 0 and d^2C/dt^2 = C''(t) > 0

dC/dt = C'(t)

= 80 * 1/2 (t² + 10,000)^(-1/2) × 2t + 40 × (-1)

dC/dt = C'(t)

= 80t/√(t² + 10,000) - 40 = 0

80t/√(t² + 10,000) = 40

80t = 40√(t² + 10,000)

2t = √(t² + 10,000)

square both sides:

4t² = t² + 10,000

3t² = 10,000

t² = 10,000/3

t = 100/√3

≈ 57.735

d^2C/dt^2 =

C''(t) = [80√(t² + 10,000) - 80t × t/√(t²+10,000)] /√(t²+10,000)

C''(t) = [(80(t²+10,000) - 80t²) / √(t²+10,000)] /√(t²+10,000)

C''(t) = 800,000 / (t² + 10,000)^(3/2)

C''(t) > 0 for all t

Therefore C(t) is minimized at t = 100/√3

C(100/√3) = 80√(10,000/3 + 10,000) + 40 × (1200 - 100/√3)

= 80 √(40,000/3) + 48,000 - 4000/√3

= 16000/√3 + 48,000 - 4000/√3

= 48,000 + 12,000/√3

= 48,000 + 4,000√3

= 4000 (12 + √3)

≈ 54,928.20

Minimum cost is $54,928.20

This occurs when cable is laid underwater from point P to point T(57.735 m east and 100m north of P) and then underground from point T to point Q (1200 - 57.735)

= 1142.265 m

5 0
3 years ago
Y’all mind to help a dumb asian?
insens350 [35]

Answer:

A is 62 b is 54 c is 62 and d is 62

And 7

Step-by-step explanation:

Since it equals to 180 you add 62 and 54 which gives u 118 then subtract it

Not sure about the second one

7 0
3 years ago
Read 2 more answers
I NEED HELP PLZ AHHHH
rjkz [21]
With what? I might be able to help
3 0
3 years ago
Which postulate can be used to prove that two triangles are congruent
user100 [1]
Side-Side-Side Theorem, Side-Angle-Side, Angle-Angle-Side, Angle-Side-Angle, and Hypotenuse-Leg for right triangles. 

For example, for Side-Side-Side, if you prove all 3 sides of the triangle are congruent, then the triangle is congruent. 
3 0
3 years ago
You are conducting a study to see if the proportion of voters who prefer Candidate A is significantly different from 0.36. With
Dafna11 [192]

Answer:

We need to conduct a hypothesis in order to test the claim that the true proportion is 0.36 so then we need to conduct a two tailed test, the system of hypothesis are.:  

Null hypothesis:p=0.36  

Alternative hypothesis:p \neq 0.36  

Since is a bilateral test the p value would be:  

p_v =2*P(z>2.074)=0.0381  

Step-by-step explanation:

Data given and notation n  

n represent the random sample taken

\hat p estimated proportion of interest

p_o=0.36 is the value that we want to test

z would represent the statistic (variable of interest)

p_v represent the p value (variable of interest)  

Concepts and formulas to use  

We need to conduct a hypothesis in order to test the claim that the true proportion is 0.36 so then we need to conduct a two tailed test, the system of hypothesis are.:  

Null hypothesis:p=0.36  

Alternative hypothesis:p \neq 0.36  

When we conduct a proportion test we need to use the z statisitc, and the is given by:  

z=\frac{\hat p -p_o}{\sqrt{\frac{p_o (1-p_o)}{n}}} (1)  

The One-Sample Proportion Test is used to assess whether a population proportion  is significantly different from a hypothesized value .

Calculate the statistic  

For this case the statistic is given:

z = 2.074

Statistical decision  

It's important to refresh the p value method or p value approach . "This method is about determining "likely" or "unlikely" by determining the probability assuming the null hypothesis were true of observing a more extreme test statistic in the direction of the alternative hypothesis than the one observed". Or in other words is just a method to have an statistical decision to fail to reject or reject the null hypothesis.

The next step would be calculate the p value for this test.  

Since is a bilateral test the p value would be:  

p_v =2*P(z>2.074)=0.0381  

5 0
3 years ago
Other questions:
  • Can you answer these two questions
    6·1 answer
  • Determine the scale factor of the following dilation. Type a numerical answer in the space provided. Do not type spaces in your
    10·2 answers
  • I need help answering number 8 please
    13·1 answer
  • PLZ HURRY, 20 POINTS. Is this equation true or false, if its true tell the answer, if its false than no answer.
    13·2 answers
  • Marshall wants to run laps around the circular track shown below. He starts at the center of the track and walks 72 yards to the
    8·2 answers
  • Helppppp pls will put brainliest
    13·2 answers
  • Jason has 5 shirts for every 2 pairs of pants. His brother John has 7 shirts for every 3 pairs of pants. Compare the ratio by co
    12·1 answer
  • An employee working for a local seafood company is delivering fresh Maryland seafood to nearby states. After 2 hours of driving,
    15·1 answer
  • A boundaryless organization is one that what?
    15·2 answers
  • The baseball game started at 7:00 p.m. It ended at 9:15 p.m. How long did
    5·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!