1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Ivanshal [37]
2 years ago
8

Elena's hanging plant grew 6 inches in 4 months. At that rate, how many inches will it grow in 10 months

Mathematics
1 answer:
Oksi-84 [34.3K]2 years ago
5 0

Answer:

The plant will grow 15 inches in 10 months.

Step-by-step explanation:

The given information is 6 inches = 4 months, and that may not sound like much but we can get the answer just from that tidbit.

Cross multiply :

\frac{6 inches}{4 months} = \frac{x}{10 months}

4x = 60

Divide by 4 on both sides.

x = 15.

Therefore the plant will grow 15 inches in 10 months. Please mark brainliest! :)

You might be interested in
Are these two functions or no? i name brainiest
snow_tiger [21]

Answer:

these two isn't a function

Step-by-step explanation:

On the table you can see that the ratio isn't equivalent

On the chart you can see that one domain has two ranges which also tells us that this two isn't a function

3 0
3 years ago
Read 2 more answers
Change the equation of the circle x^2+14x+y^2-10y=14x 2 + 14 x + y 2 − 10 y = 14 into center-radius form of a circle.
jonny [76]

Answer:

The answer to your question is      (x + 7)² + (y - 5)² = 88

Step-by-step explanation:

Equation

                     x²  +  14x  +  y²  - 10y   =  14

Complete perfect trinomial squares

                     x² + 14x + (7)² + y² - 10y + (5)² = 14 + (7)² + (5)²

Simplify

                     x² + 14x + (7)² + y² - 10y + (5)² = 14 + 49 + 25

                     x² + 14x + (7)² + y² - 10y + (5)² = 88

Factor

                     (x + 7)² + (y - 5)² = 88   This is the equation in the form

                     center-radius

7 0
3 years ago
What is the slope of the line represented by the equation y = 4/5x-3
icang [17]

Answer:

<em>m</em> = 4/5

General Formulas and Concepts:

<u>Algebra I</u>

Slope-Intercept Form: y = mx + b

  • m - slope
  • b - y-intercept

Step-by-step explanation:

<u>Step 1: Define Equation</u>

y = 4/5x - 3

<u>Step 2: Break Function</u>

<em>Identify Parts</em>

Slope <em>m</em> = 4/5

y-intercept <em>b</em> = -3

7 0
3 years ago
Read 2 more answers
WILL MARK BRAINLIEST! PLEASE HELP!!
Ber [7]

An octagon has 8 sides. Each side is given as 2a + 1

Perimeter = 8(2a + 1)

= 16a + 8

Answer: 16a + 8

4 0
3 years ago
Read 2 more answers
In a factory, 3.25% of the jars of peanut butter produced contains less peanut butter than is advertised on the label. The facto
marshall27 [118]

Answer:

936 jars of peanut butter contain less peanut butter than usual.

Step-by-step explanation:

1. First, we need to find how many jars of peanut butter that contain less peanut butter than advertised are produced every hour.

The factory produces 1200 jars of peanut butter every hour

3.25% of those jars have less peanut butter than advertised

So: multiply (1200*.0325) (the decimal form of the percent) to find the amount of peanut butter jars that contain less peanut butter than advertised.

(1200*.0325) = 39

So the factory produces 39 jars of peanut butter that contain less peanut butter than advertised.

2. Second, we need to find how many jars of peanut butter that contain less peanut butter than advertised in three 8 hour work days.

Lets add these work days together to find the total amount of hours: (8 + 8 + 8) = 24

So: three 8 hour work days totals to 24 hours

Since the factory produces 39 jars of peanut butter that contain less peanut butter than advertised per hour. Multiply (24 * 39) to find the total amount of jars produced in three 8 hour work days.

(24 *39) = 936

A total of 936 peanut butter jars are produced in three 8 hour work days that contain less peanut butter than advertised.

3. If you want to double check your work do the following.

Since the factory produces 1200 jars an hour and 24 hours total three 8 hour work days. Multiply (1200*24) = 28800

So there is a total of 28800 jars produced in three 8 hour work days.

Then you can multiply 28800 by 3.25% of jars that contain less peanut butter to find the total amount of peanut butter jars that contain less peanut butter in three 8 hour work days.

(28800 * .0325) = 936

7 0
3 years ago
Other questions:
  • If a sprinkler waters 1 over 8 of a lawn in 1 over 4 hour, how much time will it take to water the entire lawn?
    11·2 answers
  • Diana has 41 stickers she put them in 7 equal groups she put as many as possible in each group she gave the leftover stickers to
    8·1 answer
  • On a coordinate grid, the coordinates of vertices P and Q for Polygon PQRS are P(1, 2) and Q(−1, 2). What is the length of Side
    6·1 answer
  • In a scale drawing of a statue the scale is 1 in. = 1 foot. If the scale drawing is 9 in., how tall is the statue?
    15·1 answer
  • What is 15/5? for math points
    6·2 answers
  • Can someone help me with this
    5·1 answer
  • What are the degree and leading coefficient of the polynomial?<br> - 3v² - 2v^3+ 6-8v
    10·1 answer
  • 2. Bo Diddly currently has a squash patch that measures 14 yards in length and 10 yards in
    13·1 answer
  • a grocery store is selling ground beef for $1.89 a pound. how much does it cost to buy 2.5 pounds of ground beef? please help my
    5·1 answer
  • Emily is saving money for her vacation. She started with 23.00 and earns 8.00 each day. How much money will she have on day 10?
    9·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!