We will need an image but i am happy to change my answer with the correct answer as soon as we have what we need
From 8.30 pm to 12 : 00
Difference = 12 : 00 - 08:30 = 3 : 30
3 hours 30 minutes = 3.5 hours.
Total for those hours = 3.5 * 1000 = $3500
From 12:00 to 1:00 am = 1 hour.
50% increase = 50% of 1000 = .50 * 1000 = 500
So it will increase to 1000 + 500 = $1500 per hour.
For the 1 hour extra, 1 * 1500 = $1500
Total = $3500 + $1500 = $5000
She will be paid $5000
Midpoint
We know AC is a segment and B is its midpoint. This means the length of the segment AB is half the length of the segment AC. This also means the length of the segment BC is half the length of AC, and equal to AB.
This can be visualized as follows:
Since AB=7, then BC = 7 and AC=AB+BC = 14
Answer: BC = 7, and AC=!4
Answer:
The degrees of freedom associated with the critical value is 25.
Step-by-step explanation:
The number of values in the final calculation of a statistic that are free to vary is referred to as the degrees of freedom. That is, it is the number of independent ways by which a dynamic system can move, without disrupting any constraint imposed on it.
The degrees of freedom for the t-distribution is obtained by substituting the values of n1 and n2 in the degrees of freedom formula.
Degrees of freedom, df = n1+n2−2
= 15+12−2=27−2=25
Therefore, the degrees of freedom associated with the critical value is 25.
Answer:
Well if (a,b) is in Quadrant IV which is the last quadrant the a or x is a positive number and the b or y is a negative number.