Answer:
<u>Cost = 25 + 50h</u>
cost for 8 hours of work = $425
cost for 10 hours of work = $525
Step-by-step explanation:
The question is as following:
A plumber charges $25 for a service call plus $50 per hour of service write an equation to represent the cost of hiring this plumber.
what will be the cost for 8 hours of work? 10 hours of work?
=======================================================
A plumber charges $25 for a service call plus $50 per hour
<u>Cost = 25 + 50h</u>
Where h is the number of hours of service
8 hours of work: h = 8
Substitute with h = 8 at the equation of cost
<u>Cost = 25 + 50* 8 = $425</u>
10 hours of work: h = 10
Substitute with h = 10 at the equation of cost
<u>Cost = 25 + 50 * 10 = $525</u>
Answer:
The mean for Stem is 2.5
The mean for Leaf is 81.25
The answer choice A is correct
Answer:
-2(5x-7)
Step-by-step explanation:
Factor until each factor is linear
Answer:
The equation of straight line is x = 1
Step-by-step explanation:
<u>Step </u>:-
The equation of straight line having slope 'm' and passing through the point
is 
Slope of horizontal line(that is x-axis) is m = 0
slope of vertical line (that is y-axis) is m is not defined
The equation of straight line having slope is not defined and passing through the point (1,7).

cross multiplication we will get equation

x-1 = 0
The equation of straight line is x = 1