If George completed 3/5 of work in 9 days, it means that he needs 3 days to finish 1/5th of the work.
The remaining part is 2/5 because 1-3/5=2/5. 2/5 is also 6/15
From this, how much did George do? in the first 3 days he did 1/5th and then one more day was left, during which he did 1/5/3=1/15th.
So he did in total 1/15+1/5=1/15+3/15=4/15.
this means that Paul did the rest of 6/15, so Paul did 6/15-4/15=2/15.
So we know that he does 2/15 in 4 days, which means that every two days he can do 1/15 of the work
so he would need 15 times 2 days to finish the work - 30 days!
Answer:
The answer is -77
Step-by-step explanation:
Hope this helped! Have a great day!
Answer:
g(4x) = 192x^3
Step-by-step explanation:
For this problem, f(x) is irrelevant since we are simply are dealing with g(x). We will simply replace the value of x in g(x) with 4x. So let's do that.
g(x) = 3x^3
g(4x) = 3(4x)^3
g(4x) = 3(4^3)(x^3)
g(4x) = 3(64)(x^3)
g(4x) = 192x^3
Hence, g(4x) is 192x^3.
Cheers.
A) 51, assuming this is a *right* triangle:
38^2+34^2 = 50.99^2, rounding 51!!
The shadow to the top of the tree is 60 ft it all makes sense