Answer:
The answer is below
Step-by-step explanation:
a) Cost of hiring the bicycle for 14 days is:
Cost = 65 * 14 days + 44 = 954 riyals
b) The number of days the bicycle is hired is to be the same as the number of days the bicycle is to be hired. Let us assume that the bicycle and helmet is to be hired for x days, hence:
Cost of bicycle = 65 * x + 14 = 65x + 44
Cost of helmet = 12.5 * x = 12.5x
Total cost = 65x + 44 + 12.5x = 77.5x + 44
Since 750 riyals is available, hence:
750 = 77.5x + 44
77.5x = 706
x = 9.11
Therefore the maximum number of days is 11. The total cost for 11 days is:
Total cost = 77.5(9) + 44 = 741.5 riyals
Money not spent = 750 riyals - 741.5 riyals = 8.5 riyals
Answer:
u did'nt put any problems?
Step-by-step explanation:
2. The three points you need to mark on this graph are (1,2) (2,3) and (4,5); you then draw a line through all of these points and determine whether the inches of rainfall is proportionate to the number of hours.
You mark those 3 points because at 1 hour, 2 inches of rain has fallen; at 2 hours, 3 inches of rain has fallen; and at 4 hours, 5 inches of rain has fallen
I’m just “answering” this because brainless told me to help out 4 ppl so
We have 112.5 = 225/2; cos112.5 < 0 because 90 < 112.5 < 180;
cos 112.5 = cos(225/2);
We use the trigonometric formula: cos(x/2) = -

;
Then, cos(225/2) = -

;
We have the formula: cos(270 - x) = -sinx (because cos(a-b) = cosacosb + sinasinb);
Then, cos225 = cos(270-45) = -sin45 = -

Finally, cos112.5 = -