Answer:

Step-by-step explanation:
"At least" is inclusive, so you can be 21 years old.
Answer:
Please check the attached figure!
Step-by-step explanation:
Part a)
Point A is located at the x-coordinate x=-4 and y-coordinate y=1.
Hence, the coordinates of point A = (-4, 1)
Part b)
Point B(3, -2) has been plotted and is shown in the attached figure.
It is clear from the attached diagram that point B is located at the x-coordinate x=3 and y-coordinate y=-2. Hence, the coordinates of point B = (3, -2)
Part C)
Point C has the same x-coordinate as point A i.e. x=-4 and the same y-coordinate as point B i.e. y=-2.
Hence, the coordinates of point C = (-4, -2). Point C is also plotted as shown in the diagram.
Answer:
930 dollars
Step-by-step explanation:
Let software programs = S
Video game = V
Given that a company makes a profit of $7 per software program that is, 7S and $8 per video game that is, 8V. The company can produce at most 90 software programs and at most 80 video games per week. Since the Total production cannot exceed 120 items per week.
How many items of each kind should be produced per week in order to maximize the profit?
The to get profit P
P = 7S + 8V
Since the profit on video game is higher, we will give maximum production to video game. Therefore,
P = (30 × 7) + ( 8 × 90)
P = 210 + 720
P = 930 dollars
Answer:
Just leave it and tell your teacher about it, Desmos did that to me before as well and she told me just to leave it
Answer:
Don't click the site its a scam and will give your phone a virus