Answer:
Time in which both companies charge same cost = 1.5 hour
Step-by-step explanation:
Given:
Fixed Variable
Premier Landscaping charges $15 $55
Ace Landscaping charges $65
Find:
Time in which both companies charge same cost:
Computation:
Assume in X time both companies charge same cost:
So,
Premier Landscaping total cost = Ace Landscaping total cost
⇒ $15 + $55(Time taken) = $65 (Time taken)
⇒ $15 = $65 (Time taken) - $55(Time taken)
⇒ $15 = $10 (Time taken)
⇒ Time taken = 1.5 hour
Time in which both companies charge same cost = 1.5 hour
40 students prefer vanilla. To get this answer you need to multiply 200 times 0.2 because you are trying to find 20%
Answer:
(0,0)
Step-by-step explanation:
Answer:
15 minutes
Step-by-step explanation:
Betty mows at 3 times the speed that Bullwinkle does, so is equivalent to having 3 Bullwinkles in her place. That makes the lawn get mowed as though 4 Bullwinkles were working, so it will take 1/4 the time it takes Bullwinkle to mow the whole yard. 1/4 of 60 minutes is 15 minutes.
Working together, Betty and Bullwinkle will take 15 minutes to mow the lawn.
Answer:
i√17 ≈ 4.123106i
Step-by-step explanation:
The square root of a negative number is "i" times the square root of its absolute value. It is an imaginary number.
_____
i is generally the symbol used for √(-1). In some fields, such as electrical engineering, where i has a different meaning, the symbol j may be used instead.