1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
miv72 [106K]
2 years ago
13

2x + 3y = 26 3x + 5y = 40

Mathematics
1 answer:
vaieri [72.5K]2 years ago
3 0

2x + 3y = 26 -- equation 1

3x + 5y =40 -- equation 2

(Equation 1) * 3

6x + 9y = 78 -- equation 3

(Equation 2) * 2

6x + 10y = 80 -- equation 4

(Equation 4) - (Equation 3)

y = 2 -- equation 5

(Equation 5)'s value of y into (Equation 1)

2x + 3(2) = 26

2x = 20

x = 10

Thus x = 10 and y = 2

Hope that helps!

You might be interested in
9.4.15
Brilliant_brown [7]

Answer:

250

Step-by-step explanation:

mulitply 28.95 by 4 to get that out of the way, this equals 115.

subtract: 200-115=85

divide: 85/.34

answer:250

3 0
3 years ago
Read 2 more answers
If x represents the probability of an event happening, then which of the following represents the probability that the event wil
Bad White [126]
If the turn out of an event is to take place or not to take place only then, the sum of the probability of it taking place and not taking place is 1. If we represent the probability of it taking place by x then, the probability of it not taking place is equal to 1 - x. 
6 0
3 years ago
longitud del radio de la circunferencia circunscrita a un heptágono regular si su diagonal de menor longitud mide 42 cm
oksano4ka [1.4K]

Answer:

The answer is easy.

Step-by-step explanation:

6 0
3 years ago
There are four steps in the manufacturing process of a stuffed toy: cutting, stuffing, sealing, and packaging. There are two emp
Anit [1.1K]

Answer:

(a) 2min/15units

(b) 1min/20units

(c) The bottleneck stage is cutting. The process capacity is 450units/hour

(d) The capacity of the new employee should be 1unit/2sec. The process capacity will increase four times

Step-by-step explanation:

(a) Cycle time for stage cutting for 2 employees = 16sec/2units × 1min/60sec = 2min/15units

(b) Cycle time for stage sealing for 1 employee = 3sec/1unit × 1min/60sec = 1min/20units

(c) Process capacity of stage cutting = 15units/2min × 60min/1hour = 450units/hour

(d) If the capacity of the new employee is 1unit/2sec, the process capacity = 1unit/2sec × 3600sec/1hour = 1800units/hour. The process capacity increases 4 times (1800/450 = 4)

7 0
3 years ago
What is the simplified form of i^3<br> O A. 1<br> O B.-i<br> O c. i<br> O D. -1
Anvisha [2.4K]

Answer:

B

Step-by-step explanation:

B because i² makes +1 and i=-1

so i³=-i

4 0
3 years ago
Read 2 more answers
Other questions:
  • How much water should be added to 14mL of 15% alcohol solution to reduce the concentration to 7%
    8·1 answer
  • Mary runs 4 laps in 8 minutes.Nicole runs 12 laps in 18 minutes.Who runs the fastest?
    6·2 answers
  • PLEASE HELP ASAP!!
    13·1 answer
  • Don't mind the other one i click it was on mistake!
    7·1 answer
  • An artist is deciding between two different triangular shapes to use for a sculpture. The first triangle has a base of 20 feet a
    8·2 answers
  • What's the expanded form 310409
    9·1 answer
  • A brick of lead weighs 6,328 grams and has the following dimensions: length of 20 cm, height
    13·1 answer
  • Th of
    13·1 answer
  • URGENT 30 POINTS An engineer needs to find the length of a beam to support the beam holding the wall. If the two beams are perpe
    14·1 answer
  • A farmer is mapping out his acreage to
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!