The similarities / characteristics the two cars share
An example of Monitoring progress and modeling with mathematics algebra is solve the Linear Equations of x − 3 = -5.
<h3>What is Progress monitoring?</h3>
In project management, progress monitoring is known to be the act of forming project plans, setting goals and systematically analyzing results to known the progress of the project. This can also be done through the use of mathematical functions.
The Linear Equations of x − 3 = -5.
x = -5 + 3
x = -2
Therefore, the answer is -2.
Learn more about Monitoring progress from
brainly.com/question/25840534
It is called social desirability bias response.
<h3>What is social desirability bias?</h3>
Social desirability bias is a form of biased response to surveys or interviews whereby responders try to present themselves such that others in the society will be in approval of them.
Responses to surveys or interviews are supposed to be totally objective and not biased in any way. However, when surveys are about issues that relate to personality, political topics, etc, social desirability bias may come in.
Respondents may want to answer in such a way that their personality is acceptable or their political views (political correctness) aligns with that of the majority.
When it comes to answering surveys or responding to interviews, these kinds of responses are termed social desirability responses.
More on social desirability bias can be found here: brainly.com/question/4793861
#SPJ1
There’s no picture of context
It's not A or B. And between C and D, I'd choose flexible schedules. <span />