To solve this problem, let us say that the action of
totally painting a small house is called “1 job”. Therefore the rates of each
person in painting the small house are:
Bill = 1 job / 3 days = 1 / 3
Sharon = 1 job / 4 days = 1 / 4
Wilber = 1 job / 5 days = 1 / 5
Therefore the total rate is calculated by simply adding
the rates of the three.
(1 / 3) + (1 / 4)
+ (1 / 5) = 1 / x
where x is the number of hours it take if all them paint
together
Calculating for by multiplying both sides by 60:
60 [(1 / 3) + (1 /
4) + (1 / 5) = 1 / x]
(60/3) + (60/4) + (60/5) = 60 / x
20 + 15 + 12 = 60 / x
47 = 60 / x
x = 60 / 47 hours
Answer:
60/47 hours
Answer:
C
Explanation:
A: 2 in. by 2 in. by 1 in. = 4 cubic inches
B: 1 in. by 1 in. by 1 in. = 1 cubic inches
C: 2 in. by 1.5 in. by 0.5 in. = 1.5 cubic inches
D: 3 in. by 0.5 in. by 1.5 in. = 2.25 cubic inches
Therefore, the answer is C.
All you have to do is add 25 to 15.
25+15=40
So, the time he arrives at work is at 7:40 AM.
Answer:
15 men, 9 women, 21 children
Step-by-step explanation:
45/3 = 15 men
45/5 = 9 women
15+ 9 = 24
45-24 = 21 children