If the first gardener can finish the job in 6 hours, it means that every hour he completes 1/6 of the job.
By the same logic, the second gardener completes 1/7 of the job per hour.
So, if they work together, they complete

of the job per hour.
So, after 42/13 of a hour, they'll complete the job. Since one hour is made of 60 minutes, 42/13 of a hour is

So, it will take them about 194 minutes to finish the job, i.e. about 3 hours and 14 minutes.
First and foremost that is a quadrilateral, because it is a 4-sided figure. If it was a trapezoid it would have only 1 set of parallel lines. So NOT a trapezoid. It is a parallelogram because parallelograms have 2 pair of parallel lines. It is not a rhombus because a rhombus has 4 equal length sides. So it's not a square either. It is not a rectangle either because rectangles have 4 right angles and this one does not. So your choices are 1 and 3.
Bse is 10
x^m, x is base of exponent