Answer:
The answer to your question is speed = 9 m/s
Step-by-step explanation:
Data
Winner Last runner
time = 45 s time = 48 s
speed = 9.6 m/s
Process
1) Calculate the distance they ran using the data of the winner
speed = distance / time
-Solve for distance
distance = speed x time
-Substitution
distance = (9.6)(45)
-Result
distance = 432 m
2.- Calculate the speed of the last runner
-Substitution
speed = 432/48
-Result
speed = 9 m/s
Answer:
3x² + 2x + 3 / b
Step-by-step explanation:
This is the correct answer. Hope this helps
Answer:
4.75% probability that the line pressure will exceed 1000 kPa during any measurement
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean and standard deviation , the zscore of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:
What is the probability that the line pressure will exceed 1000 kPa during any measurement
This is 1 subtracted by the pvalue of Z when X = 1000. So
has a pvalue of 0.9525
1 - 0.9525 = 0.0475
4.75% probability that the line pressure will exceed 1000 kPa during any measurement
Answer:
100000
Step-by-step explanation:
10x10x10x10x10= 100000