Well, since it asks for an estimation, let's make a rough guess.
Let's round 24% to 25%.
25% is 1/4 of 60.
60 divided by 4 equals to 15.
Estimate will be 15.
Answer:
x > 38° only satisfies the condition.
Step-by-step explanation:
Given triangle ΔNPO, and ∠ PNM is the exterior angle to the interior angle ∠ PNO of the triangle.
So, ∠ PNM = ∠ NPO + ∠ PON
⇒ x = 38° + 39° = 77° {Given that ∠ PNM = 38° and ∠ PON = 39°}
{Since the exterior angle of an interior angle of a triangle is equal to the sum of the other two interior angles}
Hence, x > 38° only satisfies the condition. (Answer)
$7.25 per hour.
$198.65 divided by 27.4=7.25
To check your work do 7.25x27.4 it should equal 198.65 (it does).
Answer:
Step-by-step explanation:
Given
Truck A speed is
Truck B speed is
Truck A leaves 2 hours before truck B
Distance traveled in the 2 hour
Suppose Truck B will catch truck A after t hours
Overtake time is
Answer:
well ik it's 7 billion something and then I searched up and the closest would be C