The correct answer should be 30 because you don't want too much pressure .
Answer:
d. The maintenance costs associated with the napkin folding machine.
Explanation:
The cost that required one or more processors to produced a final product is known as joint cost
Here in the given question, the maintenance cost is not considered to be a joint cost as this cost are associated with the paper napkins
Also, the pulping, screening, rolling, etc are considered to be joint cost
Hence, the correct option is d.
Answer:
3. MOH allocated to job= predetermined MOH rate * actual amount of allocation base used by the job
Explanation:
3. MOH allocated to job= predetermined MOH rate * actual amount of allocation base used by the job
The predetermined overhead rate is used to apply manufacturing overhead costs to production jobs. the quantity of a cost driver required by a particular job is multiplied by a predetermined overhead rate to determine the amount of overhead cost applied to the job.
An estimate is made of
- the amount of manufacturing over head that will be incurred during a specific period of time and
- the amount of the cost driver ( or activity base) that will be used or incurred during the same time period. the predetermined overhead rate is computed as follows
Predetermined Overhead Rate= Budgeted Manufacturing Overhead Cost/ Budgeted amount of cost driver
The predetermined overhead rate is used to apply manufacturing overhead costs to production jobs. The quantity of the cost driver ( or activity base ) required by a particular job is multiplied by the predetermined overhead rate to determine the amount of overhead cost applied to the job.
Answer: variable; fixed
Explanation: In the short run, Kyoko's workers are variable inputs. This is because, the number of workers needed can be varied based on production needs, even in the short run. Examples are energy, labor etc.
Kyoko's ovens are fixed inputs. Fixed inputs are those inputs whose quantities cannot be changed in the short run by a firm as it seeks to change the quantity of output produced. Examples are equipment, land and building.
Answer:
$262.50
Explanation:
Multiply $350 by 0.75 since it is 25% off and the remaining is 75% to get the answer of $262.50.