1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
fredd [130]
2 years ago
15

Can somebody please help answer this word problem using grass method? And showing how u get the answer thanks!!!

Mathematics
1 answer:
siniylev [52]2 years ago
5 0

Answer:

0.25m or 1/4m

Step-by-step explanation:

Given Height of Dorsal Fin = 1/6 of Length of whale Sculpture,

and given length of whale sculpture = 1.5m or 1\frac{1}{2} m\\

Height of Dorsal fin on scuplture = (\frac{1}{6})(1\frac{1}{2} )\\

= (\frac{1}{6} )(\frac{3}{2}) \\= \frac{3}{12} \\= \frac{1}{4}m or 0.25m

You might be interested in
Does anyone know a edulastic hack?
poizon [28]

Answer: The Pacing Method:

Use Edulastic to help convey weekly expectations and track student progress along the way

You can set up Edulastic to function as your check-in-tool with students, and Edulastic will help you in gathering student data during this process (#Edulasticforthewin!). This can help in estimating student participation grades and preparing reports to supervisors. It can also help with pacing and students staying on task.

When I was a high school science teacher I would structure “Check ins” with my students on written handouts that students had to present to me for my signature (upon meeting and discussing project updates, hearing feedback from me etc.). If I had access to Edulastic tools then, I could have instead coordinated these check ins digitally and privately using Edulastic. They could check-in on their own time, at home or at school. That makes things a heck of a lot more efficient than having students form a line waiting to talk to me at my desk! You can set this up to occur at the every other day mark, weekly mark, biweekly, or even monthly mark depending upon length and scope of a project in place.

Check out how this might look in Edulastic:

Step-by-step explanation:

4 0
3 years ago
Diamond deposited $300 in a savings account that has a 2% interest rate per
Alexxandr [17]

Answer:

After 1 year: $306

After 2 years: $312.12

Step-by-step explanation:

Use the formula 300 x 1.02^{t}

t = no of years

So, Deposit x interest rate^{years}

4 0
3 years ago
Southern Oil Company produces two grades of gasoline: regular and premium. The profit contributions are $0.30 per gallon for reg
Contact [7]

Answer:

a) MAX--> PC (R,P) = 0,3R+ 0,5P

b) <u>Optimal solution</u>: 40.000 units of R and 10.000 of PC = $17.000

c) <u>Slack variables</u>: S3=1000, is the unattended demand of P, the others are 0, that means the restrictions are at the limit.

d) <u>Binding Constaints</u>:

1. 0.3 R+0.6 P ≤ 18.000

2. R+P ≤ 50.000

3. P ≤ 20.000

4. R ≥ 0

5. P ≥ 0

Step-by-step explanation:

I will solve it using the graphic method:

First, we have to define the variables:

R : Regular Gasoline

P: Premium Gasoline

We also call:

PC: Profit contributions

A: Grade A crude oil

• R--> PC: $0,3 --> 0,3 A

• P--> PC: $0,5 --> 0,6 A

So the ecuation to maximize is:

MAX--> PC (R,P) = 0,3R+ 0,5P

The restrictions would be:

1. 18.000 A availabe (R=0,3 A ; P 0,6 A)

2. 50.000 capacity

3. Demand of P: No more than 20.000

4. Both P and R 0 or more.

Translated to formulas:

Answer d)

1. 0.3 R+0.6 P ≤ 18.000

2. R+P ≤ 50.000

3. P ≤ 20.000

4. R ≥ 0

5. P ≥ 0

To know the optimal solution it is better to graph all the restrictions, once you have the graphic, the theory says that the solution is on one of the vertices.

So we define the vertices: (you can see on the graphic, or calculate them with the intersection of the ecuations)

V:(R;P)

• V1: (0;0)

• V2: (0; 20.000)

• V3: (20.000;20.000)

• V4: (40.000; 10.000)

• V5:(50.000;0)

We check each one in the profit ecuation:

MAX--> PC (R,P) = 0,3R+ 0,5P

• V1: 0

• V2: 10.000

• V3: 16.000

• V4: 17.000

• V5: 15.000

As we can see, the optimal solution is  

V4: 40.000 units of regular and 10.000 of premium.

To have the slack variables you have to check in each restriction how much you have to add (or substract) to get to de exact (=) result.  

3 0
3 years ago
which of the following group of numbers are all prime numbers a.2,5,15,19 b.7,17,29,49 c.3,11,23,31 d.2,3,5,9,
antoniya [11.8K]
Prime numbers are those that cannot be divided by another number (other than themselves and 1). In other words, prime numbers have factors of themselves and 1.

For example, 3 is a prime number because its only factors are 3 and 1.

6 is not a prime number because it can be factored to 3*2.

Therefore, the correct answer is c. 3,11,23,31
6 0
3 years ago
Read 2 more answers
The amount of bacteria in a fish tank was 830. After 5 hours, the amount of bacteria is 3202.
alina1380 [7]

Answer: 37.92

Step-by-step explanation: We know that 3202 / 5 = 640.4.

We subtract that by 830 to get (830 - 640.4  =) 189.6. Then we do / by five again to get 37.92. That is the answer.

3 0
2 years ago
Other questions:
  • Find the slope:<br> y = -X – 1
    10·2 answers
  • The width of a rectangular room is 55% of its length. The length of the room is 20 feet. What is the area of the room?
    14·1 answer
  • What is 0.024mm to m
    12·1 answer
  • Find the length here asap
    8·2 answers
  • (6,-1) and y = – 1/3x+ 1<br> y = 3x + [?]
    7·1 answer
  • Help me right now its easy 30pts
    7·1 answer
  • Triangle ABC is a right triangle with lengths shown.
    8·1 answer
  • Triangle XYZ is rotated 90° counterclockwise about the origin.
    7·2 answers
  • Please help
    6·1 answer
  • Can someone please help me please?
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!