Answer:
46.2%
Step-by-step explanation:
6/13 x 100% = 46.1538461538% (rounded to the nearest tenth: 46.2%)
Hope that helps!
Answer:
b
Step-by-step explanation:
Answer:
(6,5)
Step-by-step explanation:
The equation is in point slope form: 
'm' is the slope.
(x1, y1) is the point used to create the equation.
The number 6 replaces the x1 spot.
The number 5 replaces the y1 spot.
So a point that lies on the line should be (6,5).
Answer:
<u>The z-score = -3.7 and p (-3.7) = 0.00011 or 0.011%</u>
Step-by-step explanation:
1. Let's review the information given to us to answer the question correctly:
Mean of time to finish a test = 60 minutes
Standard deviation of time to finish a test = 10 minutes
Time that a student finishes the test = 23 minutes
2. What is the z-score for the student?
z-score = (Time that a student finishes the test - Mean of time to finish a test)/Standard deviation of time to finish a test
Replacing with the real values:
z-score = (23 -60)/10 = -37/10 = -3.7
<u>z-score = -3.7 and p (-3.7) = 0.00011 or 0.011%</u>