We solve the as follows:
<span>1. Solve proportion 12/15 = 18/b
</span>( 12/15 = 18/b ) b<span>
( 12b/15 = 18 ) 15/12
b = 18(15/12)
b = 45/2
2. Solve equations
A. -x + 4 = x +6
</span>-x + 4 - x = x +6 - x
<span>-2x + 4 - 4 = 6 - 4
-2x = 2
x = -1
B. 5n + 7 =7(n+1) -2n
5n + 7 = 7n + 7 - 2n
5n -7n + 2n = 7 - 7
0 = 0
C. -4(p+2) + 8 = 2(p-1) - 7p + 15
-4p - 8 + 8 = 2p - 2 - 7p + 15
-4p + 7p - 2p = -2 + 15 + 8 - 8
p =13
3. Solve a/b x - c = 0 for x
</span>a/b x - c = 0
( a/b x = c ) b/a
x = bc / a
Answer:
15 days
Step-by-step explanation:
Let x be the number of days needed for B to complete the job. Then x-5 is the number of days needed for A to complete the job.
In 1 day,
- A completes
of all work; - B completes
of all work.
Hence, in 1 day both A and B complete
of all work. A and B working together can do a work in 6 days. Then

Solve this equation:

If
then
that is impossible. So, B needs 15 days to complete the work alone.
5n(n^2+n+7)-3n(n^2+2n)
<span>5n^3+5n^2+35n-3n^3-6n^2 </span>
<span>2n^3-n^2+35n </span>
<span>n(2n^2-n+35)</span>
Answer:
use connects Q&A... they answer better nd quick
<span>The student apparently added numbers without taking into account direction. They seem to have added 15 and 25 and divided by 2 to get the horizontal component of the middle stop when they should have added 15 and -25 and divided by 2. A similar mistake was made on determining the vertical component. The middle stop should have been calculated as 5 blocks west and 7 blocks south of the central station. So your answer is C.</span>