Answer:
So to maximize profit 24 downhill and 20 cross country shouldbe produced
Step-by-step explanation:
Let X be the number of downhill skis and Y the number of cross country skis.
Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours
Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.
Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90
total finishing time taken = 0.5x+1.5 y≤42
Profit function
Z = 50x+50y
Objective is to maximize Z
Solving the two equations we get intersecting point is
(x,y) = (24,20)
In the feasible region corner points are (0.28) (36,0)
Profit for these points are
i) 2200 for (24,20)
ii) 1400 for (0,28)
iii) 1800 for (36,0)
So to maximize profit 24 downhill and 20 cross country shouldbe produced.
Answer:
(-2, -2)
Step-by-step explanation:
Answer:
17
Step-by-step explanation:
3(5)+=17 plug 5 in for x then solve hope this helps
Answer:
You are selecting marbles with replacement. The marble selections (trials) are independent and the marble selection follows the binomial distribution.
The probability of selecting a red marble the first time is 1313.
(This is because 4 out of 12 marbles are red and412412 reduces to 1313.
The probability of selecting a red marble the second time is 1313.
The marble selections are independent and you can multiply the two probabilities to get the following:
probability of getting 2 reds = (13)2(13)2
=19=19.
So the probability of getting two reds is 1919.