Answer:
Step-by-step explanation:
<u>Below numbers are divisible by the number of students:</u>
<u>Lets find GCF of 24 and 36:</u>
- 24 = 2*2*2*3
- 36 = 2*2*3*3
- GCF(24,36) = 2*2*3 = 12
The largest possible number of students is 12
Area=14.6
To find a trapezoid
Top +Bottom /2 multiplied by height
So 2.5+ 4.8= 7.3
7.3/2= 3.65
3.65x4=14.6
Answer:
Critical value: z = 1.28
The 80% confidence interval for the mean repair cost for the washers is between $46.487 and $82.033.
Step-by-step explanation:
We have that to find our
level, that is the subtraction of 1 by the confidence interval divided by 2. So:

Now, we have to find z in the Ztable as such z has a pvalue of 
So it is z with a pvalue of 1-0.1 = 0.9, so z = 1.28
Now, find the margin of error M as such

In which
is the standard deviation of the population and n is the size of the sample.
So

The lower end of the interval is the mean subtracted by M. So 64.26 - 17.773 = $46.487.
The upper end of the interval is M added to the mean. So 64.26 + 17.773 = $82.033.
The 80% confidence interval for the mean repair cost for the washers is between $46.487 and $82.033.