Answer:
258
Step-by-step explanation:
=
=
240x0.075=100a
=0.018x100
=18+240
=258
Answer:
7
Step-by-step explanation:
if you dont know a math problem. always assume 7.
Answer: see below
Step-by-step explanation:
11.3x=15-2x
We move all terms to the left:
11.3x-(15-2x)=0
We add all the numbers together, and all the variables
11.3x-(-2x+15)=0
We get rid of parentheses
11.3x+2x-15=0
We add all the numbers together, and all the variables
13.3x-15=0
We move all terms containing x to the left, all other terms to the right
13.3x=15
x=15/13.3
x=1+1/7.8235294117647
Answer:
W = 2747,1 [J]
Step-by-step explanation:
Chain is 64 meters long with mass 24 Kg
Then weight of the chain is p = 24 * 9.8
p = 235.2 [N] N = kg*m/s²
And by meter is 235,2 / 64 = 3.675
Total work has two component
- work to lift the 13 top meters of chain W₁
W₁ = ∫₀ᵇ F(y) dy
- work to lift last ( 64 - 13 ) meters 51 W₂
W₂ = 3.675 * 51 * 13 Kg m² /s² [J]
W₂ = 2436,53 [J]
We need to calculate W₁
W₁ = ∫¹³₀ mgy dy ⇒ W₁ = ∫¹³₀ 3,675 ydy
W₁ = 3,675* ∫¹³₀ ydy W₁ = 3,675* y²/2 |₀¹³
W₁ = 3,675* 84,5 [J]
W₁ = 310,54 [J]
And total work W
W = W₁ + W₂
W = 310,54 + 2436,53 [J]
W = 2747,1 [J]