Answer:
d. dismissing all managers who fail to achieve operational goals specified in the budget
Explanation:
The budget, no matter how well it's done, It's a forecast.
Price can change without the company being able to intervene, the same goes for consumer demand, foreign currency rates changes, and other variables in the budget.
Having that in mind, the accounting can measure the variance and check the efficiency and price influence in the result below expected.
Therefore, dismiss immediately after not achieving a goal is not the purpose of a budget
Answer:
Predetermined overhead rate
Explanation:
The predetermined overhead rate is the rate that is computed by taking the estimated manufacturing overhead and the same would be divided by allocation factor that could be estimated direct labor, estimated direct hours, etc in order to assign the overhead cost
So according to the given situation, the first option is correct i.e. predetermined overhead rate
The portfolio beta would simply be the summation of the
weighted average of each beta.
Where weighted average of each beta is calculated as:
Stock weighted average = Stock proportion * Individual
beta
Therefore,
Stock A beta weighted average = 0.2 * 0.4 = 0.08
Stock B beta weighted average = 0.3 * 1.2 = 0.36
Stock C beta weighted average = 0.25 * 2.5 = 0.625
Stock D beta weighted average = 0.25 * 1.75 = 0.4375
The summation of all betas yield the overall portfolio
beta:
Portfolio beta = 0.08 + 0.36 + 0.625 + 0.4375
<span>Portfolio beta = 1.5025 ~ 1.5</span>
Answer:
Equivalent unit of conversion = Unit completed and transferred out+Ending WIP*Percent completion
= 15000+(3000*75%)
Equivalent unit of conversion = 17250
Total cost of conversion cost = 4500+32450+18710 = 55660
Cost per equivalent unit of conversion Cost = Total Cost/Equivalent unit = 55660/17250 = 3.23
Mainly racism means judges anybody to see his / her colour