Answer:
B)13 pints
Step-by-step explanation:
SO first we find the unit rate
We know that in 90 minutes (hour and a half), the water leaked 6 pints form 2;30 to 4
Now So we can divide to find unit rate
6/90=1/15
So 1 pint for every 15 minutes
And now we want to know the amount it takes from 2:30 to 6:30 which is 4 hours
40 hours is 240 minutes
SO we can divide now
240/15=16
SO 16 pints leaked but the question asked for remaining water in container
So 29-16 is 13
So B)13
I think it is d. the last one
Answer:
35
Step-by-step explanation:
35
What is 50 percent (calculated percentage %) of number 70? Answer: 35.
Answer:

Step-by-step explanation:
Hello!
because if you multiply numbers with exponents you add the exponents.
Now we've got
.
Sadly it has to be in exponential form. You can substitute
into the equation if you know a.
Answer:
The equation would be y = 1/23x - 251/23
Step-by-step explanation:
To start, you need to locate the slope of the first equation. Since the slope is the coefficient of x, we know it to be -23. Now, the perpendicular slope is the opposite and reciprocal of that, which makes the new slope 1/23.
Now that we have this, we can use the point and the slope in point-slope form to get the equation.
y - y1 = m(x - x1)
y - 11 = 1/23(x - 2)
y - 11 = 1/23x - 2/23
y = 1/23x - 251/23