Answer:
a. Copy the range of cell D7:D9 then select cell D6 and paste the selection with date format selected. The function will be represented in formula bar with adding +4;365 days.
b. Copy the range of cell D7:D9 then select cell D6 and paste the selection with date format selected. The function will be represented in formula bar with adding -3;365 days.
c. In the formula bar type =365 days; +2 : E6
d. In the formula bar type =365 days ; +2 : C6
Explanation:
Excel is a software which helps the users to easily calculate complex calculation with just one function input. The users can create worksheets using the excel and then link those worksheets with each other. The data can be displayed in the form of table or simple text. It has multiple options to create annual day wise filtered worksheets.
Answer:
b. Britain (France)
Explanation:
The nominal exchange rate is the rate at which an individual can trade the currency of his country for another country.
According to the numbers given for exchange rates, the real exchange rate between American and foreign goods is lowest with Britain.
Answer:
Cybernetic approach
Explanation:
Cybernetic approach is the method or the approach for exploring the system of the regulatory, its possibilities, structures and constraints. It involve the study of derived concepts, feedback and black boxes like the communication and the control in business and living organisms, involving the self - organization.
Therefore, when the communication is investigated at the workplace through finding the optimal methods which is set up for the communication network system for the employees who telecommute, states the cybernetic method to communication.
If I've got it right, the answer with missing word looks like this: The market-perceived quality attributes are embedded in the total product, that is, the physical or core product and all the additional features the consumer expects.
Answer:
Explanation:
1. Calculate the efficiency variance for variable overhead setup costs.
This will be calculated as:
= Standard Hours - Actual Hours) × Standard rate
= (15000/225 × 5.25 - 15000/250 × 5) × 38
= (350 - 300) × 38
= 50 × 38
= 1900 Favourable
2) Calculate the rate variance for variable overhead setup costs.
This will be:
= Standard rate- Actual rate) × Actual Hour
= (38-40) × (15000/250 × 5)
= -2 × 300
= -600 Unfavourable
3) Calculate the flexible-budget spending variance for variable overhead setup costs.
This will be the difference between the standard cost and the actual cost. This will be:
= (15000/225×5.25 ×38) - (15000/250×5 ×40)
= 13300 - 12000
= 1300 Favourable
4) Calculate the spending variance for fixed setup overhead costs.
what formular did you use.
This will be:
= Standard Cost - Actual Cost
= 9975-12000
= -2025 Unfavorable