Answer:
A rate: a measure, quantity, or frequency, typically one measured against some other quantity or measure.
A unit rate: When rates are expressed as a quantity of 1, such as 2 feet per second or 5 miles per hour, they are called unit rates. If you have a multiple-unit rate such as 120 students for every 3 buses, and want to find the single-unit rate, write a ratio equal to the multiple-unit rate with 1 as the second term.
Hope this helps.
Answer:
12.7 degrees
Step-by-step explanation:
there are 180 degrees in a straight line, and since the angle opposite a is 167.3, we subtract that from 180 and we get 12.7
The answer is <span>C. y=|x+4|-2</span>
Answer:
a) The volume of concrete needed in cubic feet is 2,112. b) The number of cubic yards of concrete needed in cubic yards is about 79. c) The cost of the concrete using cubic yards is $2,844.
Step-by-step explanation:
a) The formula of the volume is l*w*d. 24 * 11 * 8 = 264 * 8 = 2,112.
b) The way to find this is that you take 2,112 and divide it by 27. Since the answer is 78.2 repeating, you round it up to 79 so it will fill up all of the concrete.
c) Since you need 79 cubic yards of concrete, you do 79 multiplied by $36 to get the total cost of $2,844.