Answer: 201.06 cm^2
Step-by-step explanation: We're just solving for the area of a circle. A = pi•r^2. The diameter is 16 which is 2r so r = 8. 8^2 • pi = 64pi = 201.06 (rounded to 2 decimals)
Answer:
y=2x-2
Step-by-step explanation:
first, let's put the line into y=mx+b form (slope-intercept form), where m is the slope (or gradient) and b is the y intercept
add 5 to both sides
x+2y=5
subtract x from both sides
2y=-x+5
divide by 2
y=-1/2x+5/2
perpendicular lines have slopes (gradients) that are negative (one is positive, another one is negative) and reciprocal (they are essentially the same number, just "flipped")
to find the slope of I2:
since -1/2 is negative, that means the slope of I2 will be 2 (2/1 is the reciprocal of 1/2 (positive version of -1/2))
so here's our equation so far:
y=2x+b
now we need to find b
because line will pass through (3,4), we can use it to solve for b
substitute 4 as y and 3 as x
4=2(3)+b
multiply
4=6+b
-2=b
therefore the equation is y=2x-2
hope this helps!!
Answer:
A and D B and A C and B D and C
Step-by-step explanation:
Answer:
use formula y2-y1/x2-x1
Step-by-step explanation:
=8-5/3-4
=3/-1
=-3
Answer:
Sneakerheadz produced 900 pairs on Sunday. And on Monday, they produced shoes at a rate of 300 per hour.
Then the total number of pairs produced is:
S(t) = 900 + 300*t
where t represents the number of hours worked on Monday.
We know that Nuckicks only worked on Monday, and the same amount of time as Sneakerheadz, but at a rate of 480 sneakers per hour.
We can write the total number of pairs as:
N(t) = 480*t
Now we know that Nukcicks produced in Monday the sane number of pairs than Sneakerheadz produced in the two days, then we have that:
S(t) = N(t)
900 + 300*t = 480*t
900 = 480*t - 300*t = 180*t
900/180 = t
5 = t
So the factories operated 5 hours on Monday.