Answer:
It takes 70 minutes for 9 team members (painting 60 sq ft per minute) to paint a 4200 sq ft wall.
Step-by-step explanation:
4800 ÷ 20 = 240 sq ft per team member in 36 minutes
240 ÷ 36 = 6.67 sq ft per team member in 1 minute
6.67 × 9 = 60 sq ft per 9 team members in 1 minute
4200 ÷ 60 = 70 minutes (or 1 hour and 10 minutes)
Answer:
the 1st one is right
Step-by-step explanation:
A is commutative property
B is associative property
Explanation:
Given
P(1,-3); P'(-3,1)
Q(3,-2);Q'(-2,3)
R(3,-3);R'(-3,3)
S(2,-4);S'(-4,2)
By observing the relationship between P and P', Q and Q',.... we note that
(x,y)->(y,x) which corresponds to a single reflection about the line y=x.
Alternatively, the same result may be obtained by first reflecting about the x-axis, then a positive (clockwise) rotation of 90 degrees, as follows:
Sx(x,y)->(x,-y) [ reflection about x-axis ]
R90(x,y)->(-y,x) [ positive rotation of 90 degrees ]
combined or composite transformation
R90. Sx (x,y)-> R90(x,-y) -> (y,x)
Similarly similar composite transformation may be obtained by a reflection about the y-axis, followed by a rotation of -90 (or 270) degrees, as follows:
Sy(x,y)->(-x,y)
R270(x,y)->(y,-x)
=>
R270.Sy(x,y)->R270(-x,y)->(y,x)
So in summary, three ways have been presented to make the required transformation, two of which are composite transformations (sequence).
Answer:
Square footage is calculated by multiplying width by length. So if a room is 9 foot wide by 12 foot long, 9 x 12 = 108 square feet.
Step-by-step explanation:
This should help!