Answer:
C. the period of time in which at least one factor of production is fixed.
Explanation:
- The short-run is a condition, were some controls and market are not in fair equilibrium, some factors like the variables and other that are foxed have limited entry or exit to the industry.
- In the macroeconomics a long run is a time when the general price, and contractual wage rates, along with the expectations are adjusted entirely to the states of the economy. and this contrast to the short-run where the variable is not fully fixed or adjusted.
- <u>The short-run for a firm will increase the production of the marginal costs is less than the marginal revenue. The transition from the short to the long-run market equilibrium may be done on considering the supply and demands.</u>
Answer:
Broker must obtain the signature of the seller to effect a contract.
slope of this demand curve for pizza = <u>-1/40</u>
<h3>
Briefly explained</h3>
Slope = changes in y/ changes in x
The shop sells 200 more pizzas if the price drops by $5 ($10 to $5). (100 to 300 pizzas) A good's quantity is always on the x-axis and its price is always on the y-axis. According to our justification, the cost is REDUCED by $5 (a reduction of -$5) and the quantity of pizzas sold rises by 200. The slope is therefore <u>-5/200 or -1/40.</u>
<h3>
What is demand curve?</h3>
The demand curve is a graphical depiction of the connection between the cost of a commodity or service and the quantity required over a specific time period.
The price will often be shown on the left vertical axis in a representation, and the amount needed will typically be shown on the horizontal axis.
Learn more about demand curve
brainly.com/question/1139186
#SPJ4
Answer:
Organizational commitment
Explanation:
Organizational loyalty or commitment refers to the relationship of the bond that workers share with their organization. Overall, workers who are engaged in their organization usually feel connected to the organization, these workers assume that they suit in and make sure that they comprehend the organization's objectives.
Such workers ' economic value would be that they appear to become more motivated in their job, demonstrate fairly high efficiency, and are much more assertive in providing support.
For a 13-person team, The number of extra workers that should be hired to meet the labor hours needed without overtime is 7.
<h3>What is Labor hours?</h3>
This is a term that connote the total hours of workers that are said to be having or getting an hourly wage and they are the ones who are said to be directly employed on the site of a building, public works project, etc.
Note that "Labor hours" is one that entails hours of work that has been carried out by workers who have been employed by the general contractor or the subcontractors that are found to be working on the project.
Learn more about labor hours from
brainly.com/question/24868261