1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
irinina [24]
3 years ago
13

Change control in application development is a formal process for changing written documentation into online documentation, and

frequently uses specialized cyber documentation agents to create menus, screens and online user documentation.
A) True
B) False
Computers and Technology
1 answer:
Furkat [3]3 years ago
4 0

Answer:

B) False

Explanation:

The term Change control is a systematic way employed to keep track of all changes made to a product or system. It is aimed at ensuring that no unnexpected changes takes place and that changes made during application development are properly recorded.

You might be interested in
What is known as networking in the IT field?
Sidana [21]

Answer:

r u Kate tell me plz I love u baby tell me please

4 0
2 years ago
Design a generic post-implementation evaluation form. The form should consist of questions that you could use to evaluate any in
irina1246 [14]

Answer:

Project Identification

Provide the identifying information associated with the project, including the applicable project control code, system acronym, and system title.

System Proponent

Provide the name of the System Proponent.

History of the System

Briefly describe the system’s history and predecessor, if any.  State the mission needs and information requirements, including how the system is expected to help users.

Functional System Description and Data Usage

Briefly describe what the system does functionally and how the data are used by the system.

Explanation:

Overview

The Post-Implementation Review is used to evaluate the effectiveness of the system development after the system has been in production for a period of time (normally 6 months).  The objectives are to determine if the system does what it is designed to do: Does it support the user as required in an effective and efficient manner? The review should assess how successful the system is in terms of functionality, performance, and cost versus benefits, as well as assess the effectiveness of the life-cycle development activities that produced the system.  The review results can be used to strengthen the system as well as system development procedures.

The review is scheduled to follow the release of a system or system revision by an appropriate amount of time to allow determination of the effectiveness of the system.  A representative from the functional development group or other member of the major user organization participates in the review.  The System Proponent ensures that all documentation and all personnel needed to participate in the review are accessible.

The reviewer and an assigned team collect the information needed for the Post-Implementation Review by interviewing end users and their managers, system administrators, and computer operations personnel.  The report is then prepared and provided to the user organization that requested it and the information systems organization, which may jointly use the findings to initiate other actions.

The Post-Implementation Review is a free-form report, and not all sections are relevant or necessary to the final product.  A description of the Post-Implementation Review Report is attached.

3 0
3 years ago
The document asks about dependents because the number can
BARSIC [14]
The answer is: Lower overall taxes
8 0
3 years ago
Read 2 more answers
Select the phrases that apply to Java classes or methods.
oee [108]

Answer:

graficar una lista de entradas

graficar una lista de entradas

crear un nuevo objeto

condiciones de prueba

romper un ciclo

romper un ciclo

Explanation:

7 0
3 years ago
Write a family database program. Create a class to represent a person and to store references to the person’s mother, father, an
Gennadij [26K]

Do you go to BASIS?

Sorry I don't have an answer for you, but we have the same assignment in our AP Comp sci class.

Just wondering.

8 0
3 years ago
Other questions:
  • 4. Who developed the first design technology program which had a
    12·1 answer
  • The posterior auditory stream terminates in the ________ and is involved in ________.
    12·1 answer
  • Building relationships during your career exploration is called
    6·1 answer
  • What is the order of adding 10.0 to each element in a one-dimensional array of N real numbers?
    13·1 answer
  • Level of comfort that people feel
    10·1 answer
  • PLZ HELP ME ITS URGENT PlZ PLZ PLZ
    11·1 answer
  • Network address 192.10.10.0<br>​
    12·1 answer
  • 13) An-Excel-file-is-generally called-a-l-an:
    6·1 answer
  • A(n) ________ is a program that takes advantage of very low-level operating system functions to hide itself from all but the mos
    13·1 answer
  • a printer's accessory list includes a maintenance kit with a variety of replaceable parts you should install after 100,000 pages
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!