Answer:
The required expression is:
Please check the attached graph too.
Step-by-step explanation:
The slope-intercept form of the linear or line function
where
- m is the rate of change or slope
In our case,
The cost of hiring a taxi consists of a fixed cost of $3. It means the fixed cost of $3 is the initial condition.
Thus, the y-intercept b = 3
It is stated that the cost of per kilometer distance = $0.5
Thus, the rate of change or slope m = 0.5
As y represents the cost and x represents the number of kilometers.
so substituting m = 0.5 and b = 3 in the slope-intercept form of the linear or line function
y = mx+b
y = 0.5x + 3
Thus, the required expression is:
Please check the attached graph too.
1) To find the confidence interval
the sample mean x = 38 σ = 9; n = 85;
The confidence level is 95% (CL = 0.95) <span>CL = 0.95
so α = 1 – CL = 0.05
</span><span>α/2 = 0.025 </span>Z(α/2) = z0.025
The area to the right of Z0.025 is 0.025 and the area to the left of Z0.025 is 1 – 0.025 = 0.975
Z(α/2) = z0.025 = 1.645 This can be found using a computer, or using a probability table for the standard normal distribution.
<span>EBM = (1.645)*(9)/(85^0.5)=1.6058</span> x - EBM = 38 – 1.6058 = 36.3941 <span> x + EBM = 38 + 1.6058 = 39.6058
</span>The 95% confidence interval is (36.3941, 39.6058).
The answer is the letter D
<span>The value of 40.2 is <span>within the 95% confidence interval for the mean of the sample
</span></span>2) To find the confidence interval <span>
<span>the sample mean x = </span>76 σ = 20; n = 102; </span><span>
The confidence level is 95% (CL = 0.95) CL = 0.95
so α = 1 – CL = 0.05
α/2 = 0.025 Z(α/2) = z0.025
The area to the right of Z0.025 is 0.025 and the area to the
left of Z0.025 is 1 – 0.025 = 0.975
Z(α/2) = z0.025 = 1.645 This can be found using a computer,
or using a probability table for the standard normal distribution.
EBM = (1.645)*(20)/(102^0.5)=3.2575 x - EBM = 76 – 3.2575 = 72.7424 </span> x +
EBM = 76 + 3.2575 = 79.2575 <span>
The 95% confidence interval is (</span>72.7424 ,79.2575).<span>
The answer is the letter </span>A
and the letter D<span>
The value of 71.8 and 79.8 <span> are </span> outside<span>
the 95% confidence interval for the mean of the sample</span></span>
Answer:
-80
Step-by-step explanation:
Subtract 4:
-10 = x/8
Multiply by 8:
-80 = x
The value of x is -80.
_____
This sort of equation is sometimes referred to as a "two-step" linear equation.
<u>Step 1</u>. After you identify the term containing the variable (x/8), you identify any constants on the same side of the equal sign (+4). Add their opposite to both sides of the equation. That gets the variable term by itself.
<u>Step 2</u>. Then identify the coefficient of the variable (1/8). Multiply both sides of the equation by the reciprocal of this value. That will make the coefficient of the variable become 1. The constant on the other side of the equal sign is now the value of the variable.