Answer:
A
Step-by-step explanation:
if (x1,y1) and (x2,y2) are the extremities of diameter,then eq. of circle is
(x-x1)(x-x2)+(y-y1)(y-y2)=0
reqd. eq. is (x+1)(x-5)+(y+9)(y-1)=0

center is (2,-4)
r=√(2²+(-4)²-(-14))
=√(4+16+14)
=√(34)
eq. of circle is (x-2)²+(y+4)²=34
or
(x²-4x)+(y²+8y)=14
(x²-4x+4)+(y²+8y+16)=14+4+16
(x-2)²+(y+4)²=34
Answer:
G 13
Step-by-step explanation:
X/125 = 9.6%/100%
125*(9.6) / 100 = 12;
BEST estimate 13
Answer:
(1, 3)
Step-by-step explanation:
The solution to any system is where the two lines meet. It would be no solution if the lines were parallel. An ordered pair is written out in the format (x, y).
Answer:
a) 3 people will need 35 days to paint the bridge
b) p=105/t
Step-by-step explanation:
a)
We have 7 people each one is to work 15 days, so the bridge needs a total of 7(15) days of work
7(15)=105
Then we have 3 people each one is to work t days, altogether should do a total of 105 days of work
3(t)=105
Solve for t
t=35
b)
Substitute p for 3 in the second equation
p(t)=105
Solve for p
p=105/t
Step-by-step explanation: