X - the number of loads by land carriers,
y - the number of loads by air carriers;
The system of inequalities:
x + y ≤ 150
2,000 x + 1,250 y ≤ 180,000
-24a²- 6a +9 = - 3(8a² +6a - 9)
8a² +6a - 9 =0
x=(-b +/-√(b² - 4ac))/2a
x = (-6 +/-√(36+4*8*9) /(2*8) = (-6 +/-√(324) /16 = (-6 +/-18)/16
x1 = (-6 +18)/16 = 0.75
x2 = (-6 -18)/16 = - 1.5
-24a²- 6a +9 = - 3(8a² +6a - 9) = -3(a - 0.75)(a + 1.5)
Answer:
i think the answer is A
Step-by-step explanation:
i could be wrong
Answer:
It takes 70 minutes for 9 team members (painting 60 sq ft per minute) to paint a 4200 sq ft wall.
Step-by-step explanation:
According to the situation the calculation is shown below:-
= 
= 240 sq ft each member of the team in 36 minutes
= 
= 6.67 sq ft each member of the team within 1 minute

= 60 sq ft for every 9 team members in one minute
= 
= 70 minutes (or 1 hour and 10 minutes)
Hence, the 70 minutes is taken for 9 team members
<span>2x+12+6x+1-x
You are adding up 2x and 6x and deduct 1x so you get 7x
You add up 12 and 1 which gives 13</span>