Answer:
34
Step-by-step explanation:
5 1/10=5.1=5.10
5.10÷0.15
=510÷15
=34
Answer:
165
Step-by-step explanation:
First, m<UTS=m<UTV+m<VTS by Angle Addition Postulate. Then, you substitute all the values that you provided for the angles. 15x+15=x+15+140. You then solve for x.
15x+15=x+155
14x=140
x=10
You then plug back in 10 for X in the value of m<UTS. 15(10)+15=165
Answer:
4.6 hours
Step-by-step explanation:
we first need to calculate the total distance he covered and total time taken whole for the journey.
Distance= speed X time
time = Distance/speed
let the total distance be X. he covers 2/5 if the journey first.
2/5 = 0.4
Time = 0.4x/45 hours
the remaining journey is 3/5x
he covers 1/3 X 3/5= 0.2x
time taken = 0.2/90 X hours
the remaining distance = 100× 1.2 = 120km
we add 0.4x + 0.2x to get the fraction he had covered
0.6x.
the remaining distance was X - 0.6x = 0.4 X
thus 120 km represents 0.4x of the journey
we calculate now the value of X
0.4x = 120
X = 300km
Total time taken = 0.4x/45 + 0.2/90 + 1.2 hours
replace X to get time
2.7 hours + 0.7 hours + 1.2 hours
= 4.6 hours
For this case we have that by definition, the equation of a line of the slope-intersection form is given by:

Where:
m: It's the slope
b: It is the cut-off point with the y axis
While the point-slope equation of a line is given by:

Where:
m: It's the slope
It is a point through which the line passes
In this case we have a line through:
(8,4) and (0,2)
Therefore, its slope is:

Its point-slope equation is:

Then, we manipulate the expression to find the equation of the slope-intersection form:

Therefore, the cut-off point with the y-axis is 
ANswer:

Answer:
The correct answer is option C.
Step-by-step explanation:
The lower your interest rate is, the lower your monthly payments are. This is true. The interest rate is directly proportional to monthly or yearly payments. If the rates are high, the installments are high and if the rate of interest is low, the installments are lower.