Answer:
There is a significant linear correlation between the two variables.
Step-by-step explanation:
Given that part time weekly earnings are
x y
10 93
15 171
20 204
20 156
35 261
Correlation 0.9199
H0: r=correlatin =0
Ha: r ≠0
(two tailed test)
r difference = 0.9199
t = 
p value < 0.0001
Since p <0.05 we reject null hypothesis
There is a significant linear correlation between the two variables.
Answer:
1/4
Step-by-step explanation:
3/12
Simplify. Both numbers can be divided by 3.
3/12 = 1/4
Answer:
Answer:
All real numbers greater than or equal to -3
Step-by-step explanation:
we know that
The curved line could be a vertical parabola opening upwards with vertex at (2,-3)
The vertex is a minimum
The y-intercept is the point (0,1)
The x-intercepts are the points (0.25,0) and (3.75,0)
so
The domain is the interval -----> (-∞,∞)
All real numbers
The range is the interval ----> [-3,∞)
All real numbers greater than or equal to -3
Complete Question
It takes 28minutes for 7 people to paint 7 walls. How many minutes does it take 14 people to paint 14 walls?
Answer:
28 minutes
Step-by-step explanation:
It takes 28minutes for 7 people to paint 7 walls.
Hence, the today number of minutes for 1 person to paint the wall =>
7 people = 28 minutes
1 person = 28 minutes × 7 people =
198 people minutes = 7 walls
1 wall = 198 /7
1 wall = 28 people minutes
How many minutes does it take 14 people to paint 14 walls?
From the above calculation,
1 wall = 28 people minutes
14 walls =
= 14 walls × 28 people minutes/14 People
= 28 minutes
Therefore, it would take 28 minutes for 14 people to paint 14 walls.
Answer:
Step-by-step explanation:
Please give me brainliest, I did my best