Answer:
Bike Frame Flow Time
The value-added percentage of the flow time for this bike frame is:
= 46.
Explanation:
a) Data and Calculations:
Bike Frame Flow Time:
Setup time = 7 hours
Processing time = 6 hours
Storage time = 7 hours
Flow time of the bike frame = 13 hours (7 + 6)
Value-added percentage of the flow time for this bike frame = 6/13 * 100
= 46%
b) Flow time represents the amount of time a bicycle frame spends in the manufacturing process from setup to end. It is called the total processing time. Unless there is one path through the process, the flow time equals the length of the longest process path. The storage time is not included in the flow time since it is not a manufacturing process.
Answer:
Explanation:
Yes, it may still be readable, but if they refuse to take it you have no ground to stand on. (If you obscure the signature, at least make sure the CVV is readable or reprinted on top.) The plastic covering should not interfere with the mag stripe.
Answer:
B
Explanation:
i’m an information technology student and as I remember we used this name
Answer: OS(Operating System), CPU, And The Program That you use to view email
Since I have rechecked and noticed that it is not a disk space shortage, then the problem should not be on the disk but the RAM. Even basic tasks like opening up a Word document can be slow if you do not have enough RAM. You can check RAM usage in task manager by right clicking on the taskbar and selecting the task manager option. You will be required to click on the Performance tab of the task manager. Here, you will be able to graphically view how much RAM on your computer is being used. If the RAM is being over-utilized, you will have to consider upgrading your PC with more RAM.