0.726 is the probability that the project will be completed in 33 days or less.
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 30 days
Variance = 25 days
Standard Deviation,

We assume that the distribution of path length is a bell shaped distribution that is a normal distribution.
Formula:

P(completed in 33 days or less)
Calculation the value from standard normal z table, we have,

0.726 is the probability that the project will be completed in 33 days or less.
1. diginity
2.require
3.tuition
Answer:
The productivity is measured in cubic meters per kilogram.
Step-by-step explanation:
For the formula for the productivity
of the camel

where
is the area of the hump and is measured in square meters,
is the distance the camel can travel (measure in meters), and
is the mass of the camel (measured in kilograms
).
Then, the productivity of the camel is measure in


cubic meters per kilogram.