-14.5
Basically, -(7.5+4) is -11.5 and then combine -3 with -11.5 which yields -14.5
Answer:
A = (Z-CD - EFG)/B
Step-by-step explanation:
AB + CD + EFG = Z.
Subtract CD and EFG from each side
AB + CD + EFG-CD -EFG = Z-CD - EFG
AB = Z-CD - EFG
Divide each side by B
AB /B = (Z-CD - EFG)/B
A = (Z-CD - EFG)/B
From the given question we come to know of certain number of facts and they are:
At 1:00 PM the water level of the pond was = 13 inches
At 1:30 PM the water level of the pond was = 18 inches
At 2:30 PM the water level of the pond was = 28 inches
From the above given facts we can easily find the amount of water changing every half an hour.
Amount of increase in water from 1:00PM to 1:30 PM = (18 - 13) inches
= 5 inches
Amount of increase in water level from 1:30PM to 2:30PM = (28 -18) inches
= 10 inches
From the above two deductions we can come to the conclusion the the constant rate of change in water level is 5 inches for every half an hour.
The required type of p-value would she want to obtain is small p-value.
<h3>What is hypothesis test?</h3>
Hypothesis testing is a type of measurable surmising that utilizes information from an example to make inferences about a populace boundary or a populace probability distribution. Initial, a speculative supposition that is made about the boundary or dispersion.
<h3>According to question:</h3>
P-value shows that the outcomes are genuinely huge.
P-value in Measurements assists with performing speculation test and it assists with deciding the meaning of the outcomes.
A little P-value commonly (P<0.05) demonstrates solid proof against the invalid speculation in this way, we reject the invalid speculation, on opposite when P-esteem is enormous we can't dismiss the invalid speculation.
Thus, required answer is small p-value.
To know more about p-value visit:
brainly.com/question/14790912
#SPJ4
Answer:
I think the equation is 7l +5=60
Step-by-step explanation: