4x²+x³
Factor is out x³ expression
The answer is :

Carry learning!
Answer:
73:120 change 2 hours into minutes which is 120
Answer:
a. .92
Step-by-step explanation:
In a sample with a number n of people surveyed with a probability of a success of
, and a confidence level of
, we have the following confidence interval of proportions.

In which
z is the zscore that has a pvalue of
.
The margin of error of the interval is:

The lower bound is the point estimate
subtracted by the margin of error.
The upper bound is the point estimate
added to the margin of error.
Point estimate:
The confidence interval is symmetric, so it is the mean between the two bounds.
In this problem:

Sample of 400, which means that 
Margin of error is the estimate subtracted by the lower bound. So 
We have to find z.




has a pvalue of 0.96.
This means that:




Confidence level:

So the correct answer is:
a. .92
30 x 30 + 25 x 15 = $1275
So,
30 tickets were sold from the $30 type, while 15 tickets were sold from the $25 type!
4x + 2 = 62
4x = 62 - 2
4x = 60
x = 15
12y = 144
y = 12
A is the answer.