1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
PilotLPTM [1.2K]
3 years ago
10

Europeans have a greater accepatance than americans of

Social Studies
1 answer:
ANEK [815]3 years ago
3 0
Having fun, and being yourself??
I'd appreciate answer choices, that's a very opinion based question of its own haha

Hope I helped!
Giving me brainliest is much appreciated! =)
You might be interested in
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
One of the three major concerns of developmental psychology involves a focus on
Salsk061 [2.6K]

Answer:

1. Nature and nurture.

2. Continuity and stages.

3. Stability and change.

Explanation:

Developmental psychology is the scientific study of how and why human beings change over the course of their life.  Developmental psychology currently focuses in the entire human being lifespan.

Developmental psychology examines our physical, cognitive, and social development and it focuses on three major issues:

  1. Nature and nurture: How does our genetic inheritance (our nature) interact with our experiences (our nurture) to influence our development?
  2. Continuity and stages: What parts of development are gradual and continuous? What parts change abruptly in separate stages?
  3. Stability and change: Which of our traits persist through life? Which traits of characteristics of ourselves change as we grow older?

So, the question is asking for one of the three major concerns of developmental psychology but since there are no options given, I've given you the three major concerns which developmental psychology focuses in.

6 0
3 years ago
What's the difference between stress and clinical depression?
vampirchik [111]

Answer:

Explanation:

Depression is a mood disorder that causes a persistent feeling of sadness and loss of interest, it affects how you feel.

Stress, either physiological, biological,  is an organism's response to a stressor such as an environmental condition.

8 0
2 years ago
Read 2 more answers
What are the function of manors room?
Maslowich

Answer:

moo i like cows?

Explanation:

7 0
3 years ago
Read 2 more answers
What did African American abolitionists do to try and end slavery in the US?
Bingel [31]

Answer:

African American abolitionists acted as slave captures if they had a lighter skin and thousands of slaves were able to escape

Explanation:

4 0
3 years ago
Other questions:
  • The State Supreme Court has appellate jurisdiction. Which situation is an example of a case they might hear?
    9·2 answers
  • Why do we need a Government?
    14·1 answer
  • 25. A basic premise of the National Response Framework is that response structures and resources must be able to expand rapidly
    11·1 answer
  • Illustrate any three cities of the modern world which are famous for excellence. (One city of India is mandatory)
    8·2 answers
  • HELP I NEED HELP ASAP
    13·1 answer
  • Which Patriot started the "committees of correspondence" to keep the colonies talking to each other before and during the Americ
    7·1 answer
  • 1. DEVELOPMENT OF SELF IN THE SOCIETY
    8·1 answer
  • In cities such as ___________—the Congo's capital—poverty is everywhere.
    8·1 answer
  • What can be the possible reasons for the growing population in a country ?
    10·1 answer
  • which of the following best describes how president wilson's approach to latin american affairs differed from his predecessors?
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!