Answer: 315
Step-by-step explanation: hope this is right.
Answer:
$1,109.80
Step-by-step explanation:
$3580 times 31% = 1,109.80+ 3580 = $4,689.80
Answer:
•A c-chart is the appropriate control chart
• c' = 8.5
• Control limits, CL = 8.5
Lower control limits, LCL = 0
Upper control limits, UCL = 17.25
Step-by-step explanation:
A c chart is a quality control chart used for the number of flaws per unit.
Given:
Past inspection data:
Number of units= 100
Total flaws = 850
We now have:
c' = 850/100
= 8.5
Where CL = c' = 8.5
For control limits, we have:
CL = c'
UCL = c' + 3√c'
LCL = c' - 3√c'
The CL stands for the normal control limit, while the UCL and LCL are the upper and lower control limits respectively
Calculating the various control limits we have:
CL = c'
CL = 8.5
UCL = 8.5 + 3√8.5
= 17.25
LCL = 8.5 - 3√8.5
= -0.25
A negative LCL tend to be 0. Therefore,
LCL = 0
28)
330.0076
29)
V = l X w X h
V = 12 X 20 X 14
12 X 7 = 84
84 X 2 = 168
168 X 20 = 3360
The volume of the cooler is 3,360 in³
Answer:
90 visitors
Step-by-step explanation:
36=40% so X=100%
Ratio
36/40=x/100
40x=3600
x=90