Answer:
58
Step-by-step explanation:
Answer:
30
Step-by-step explanation:
First, we can say that because the men do 1/3 of the work in 20 days,
for 10 men:
20 days = 1/3 total work
Because we need the house built in 30 days, and 20 days have already passed, we only have 30-20=10 days left. Furthermore, 20/2=10, so in our equation of 20 days = 1/3 total work, we can divide both sides by 2 to get
10 days = 1/6 total work
The amount of work we need to get done in 10 days is (all of it) - (1/3 of total work) = 1 - 1/3 = 2/3 = 4/6
Since 10 men can do 1/6 of the work in 10 days, 10*4 =40 men can do 1/6 * 4 = 4/6 of the work in 10 days. This is the amount of work that needs to get done. Therefore, the contractor needs 40 (total workers) - 10 (current workers) = 30 new workers to finish the remaining work in due time
Answer:
D. 2 and 5
(Just so you know, I'm not 100% sure this is right but I'm pretty sure I've answered this exact problem before)
Step-by-step explanation:
You have to look at the intersection points between the two lines. The x values are going to be the solution, and in this case line g(x) intersects f(x) at (2,-1) and (5,-4) so you take the x values and have your solutions.
Step-by-step explanation:
cos Acos B tan(A + B)=- sin A sin B cos Acos B tan A + tan B tan(A + B)=. 1 - tan A tan B. Divide top and bottom by cos A cos B. -. +. 1-. 8.
<h2>Missing: 8b+ | Must include: 8b+</h2>
Answer:
a kite has 2 short sides and 2 long sides. The 2 short sides are equal. The 2 long sides are also equal. This means that the other short side is 16cm. And the remaining longer sides can be found like this:
let's pretend *y* is the long side
2*y = 70 - 16 - 16. (two of the long sides = 70 - short side - another short side)
so use algebra to find y.
2*y = 38
y = 19 so the long sides are both 19cm each
Your final answer: 16cm, 19cm, 19cm