1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
almond37 [142]
3 years ago
14

What do you multiple 24 with to get 120

Mathematics
2 answers:
nexus9112 [7]3 years ago
5 0

Answer:

5

Step-by-step explanation:

You get this answer because dividing is the opposite of multiplying (it can undo the multiplication. 120 / 24 = 5. To check, you can multiply 24 and 5, which does in fact equal 120. Another way is by setting up an algebraic equation. Let's make the multiplier = x. 24 x X = 120. 24x = 120. Solve for x by dividing both sides by 24. You are left with x = 5.

ohaa [14]3 years ago
3 0

Answer:

5

Step-by-step explanation:

I divided \frac{120}{24} = 5

You might be interested in
He perimeter of the figure is given. Find the length of the indicated side.
77julia77 [94]

Answer:

who's he, is it me, cuz id call that a failed abortion

3 0
3 years ago
Awarding BRAINLIEST! Please help!!
MariettaO [177]
The correct answer is -1/3.
8 0
3 years ago
Read 2 more answers
Answer for 30 points and brainilest
Snowcat [4.5K]

Answer:

6.4, 17.2, 3.8, 0.5, 6.7, 37.3, 4.9, 0.1, 12.8, 5.0

Step-by-step explanation:

4 0
3 years ago
Read 2 more answers
Ivy is trying to manage the money she spends on lunch. Between eating out and buying groceries for bagged lunches, she wants to
Jlenok [28]

choice one is correct.

8 0
2 years ago
Read 2 more answers
The volume of construction work was increased by 60% but the productivity of labor increased by only 25%. By what percent must t
Sergeu [11.5K]

Answer: 28 %

Step-by-step explanation:

Let, Initially,

V be the volume of construction work

r be the productivity of labor  

n be the number of days

x be the number workers.

Thus,  V  = r × n × x   ------------(1)      

Now, According to the question,

The volume of construction work was increased by 60% but the productivity of labor increased by only 25%.

Therefore,

Final volume of the work = 160% of V = 1.6 V

Final productivity = 125% of r = 1.25 r

Also, the time is same in both conditions,

Final time taken = n

Let y be the number of people after changes.

Thus, 1.6 V = 1.25 r × n × y -----(2)

Dividing equation (1) by equation (2)

We get, y = 1.60 x/1.25

Thus, the changes in the number of workers

= \frac{(\frac{1.60x}{1.25}-x) }{x}\times 100

= 0.28 × 100

= 28 %


5 0
3 years ago
Other questions:
  • If the area of an ice rink is 404 square yards, what is the perimeter of the rink?
    11·1 answer
  • When Megan solved this system using the elimination method , she added the equations together and got the equation 4y = 16. Then
    6·1 answer
  • Choose the missing step in the given solution to the inequality -x - 3 < 13 + 3x.
    7·1 answer
  • Is y=10-x a function?
    13·1 answer
  • Parallelogram efgh has sides of length 20 inches and 14 inches as shown. Its acute angle measures 62 degrees. Find the area of e
    14·1 answer
  • If I charged 30$ a hair cut the whole year how many times do my customers have to visit me to make17,510 the whole year
    7·1 answer
  • If x= -4 and y=-8, which expression would have a negative value?
    6·2 answers
  • -2(3+m)= <br> Solve the question
    13·1 answer
  • Given f(x)=-5x-4solve for when f(x)=1
    14·2 answers
  • Find the smallest value of k, when 882k is a cube. pls help ​
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!