Answer:
~5 feet.
Step-by-step explanation:
assuming that it is a right triangle. if a=5 and c=7 then b the other leg is equal to the square root of c squared minus a squared. which equals about 4.9
Y=-8/3x+6
You subtract y's by y's over x's minus x's and then you have the slope which is (m) then you fill in one of the points and then add or subtract one of the sides to get the answer
Answer:
Change in water level over thr period Given is 11.16 mm
Step-by-step explanation:
The change in water level. In the part of the river observed will be ;
Water level. = The rate of change in water level per year * period
Rate of change in water level = 1.8mm /year
Number of years = 6.2
The change in water level is thus :
1.8 mm / year * 6.2 years
= (1.8 mm / year * 6.2
= 11.16 mm
Answer:
$21.6/hr
Step-by-step explanation:
Time paid
For 8 hours paid as 1.5, time is 8*1.5=12 hours
Similarly, for double hours, then it is 2*2=4
Given 35 normal hours, the total time will be the sum of 35, 12 and 4 hence 35+12+4=51 hours
Considering the pay of $1101.60 this is equivalent to hourly pay of 1101.60/51=21.6
Therefore, the hourly pay is $21.6 per hour
9 has factors of 3*3.
2 is prime, so no factors.
from those two denominators, we can get the LCD of hmmm simply their product, namely 18.

now, recall that, to get the mixed fraction, we divide 89 ÷ 18, the quotient goes up front, the "4", and the remainder is the one atop, the "17".