1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
AlekseyPX
3 years ago
10

If f(x) and its inverse function, F(x), are both plotted on the same coordinate plane, what is their point of intersection?

Mathematics
1 answer:
polet [3.4K]3 years ago
5 0

Answer:  d) (3, 3)

<u>Step-by-step explanation:</u>

Inverse is when you swap the x's and y's.

Let's look at the points and find their inverse:

  f(x)           f⁻¹(x)

(0, -2)  -->  (-2, 0)

(1, -1)   -->   (-1, 1)

(2, 0)  -->   (0, 2)

(3, 3)   -->   (3, 3)       f(x) = f⁻¹(x) so this is where they intersect!

You might be interested in
Which word describes nether slope of the line ??
My name is Ann [436]
Negative is the answer
6 0
4 years ago
Read 2 more answers
BASEBALL
skad [1K]
B. One arm extended straight to the side

website: scoutlife.org

6 0
2 years ago
The graph below plots a function f(x):
Karolina [17]
By definition we have that the average rate of change of the function is given by:
 AVR =  \frac{f(x2) - f(x1)}{x2 - x1}&#10;
 Substituting values we have:
 AVR = \frac{100 - 50}{2 - 0}
 Rewriting we have:
 AVR = \frac{50}{2}
 AVR = 25
 Answer:
 If x represents time, the average rate of change of the function f(x) in the first two seconds is 25.
4 0
4 years ago
B Christian installed an electric pump to pump water from a borehole into a 30 000 litre cement dam. If the water is pumped at a
skelet666 [1.2K]

Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.

Option B)6h 40min is the correct answer.

<h3>How long does it take to fill the dam?</h3>

Given that;

  • Amount of water needed to fill the dam A = 30000 litres
  • Pump rate r = 75 litres per minute
  • Time needed to fill the dam T = ?

To determine how long it take to fill the dam, we say;

Time need = Amount of water needed ÷ Pump rate

T = A ÷ r

T = 30000 litres ÷ 75 litres/minute

T = 400 minutes

Note that; 60min = 1hrs

Hence,

T = 6hours 40minutes

Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.

Option B)6h 40min is the correct answer.

Learn more word problems here: brainly.com/question/2610134

#SPJ1

8 0
2 years ago
What is 3/4 x 2/3?<br><br><br> Pls help!!!!!!
inysia [295]

Answer:

1/2

Step-by-step explanation:

3/4 × 2/3

3 × 2/4 × 3

6/12 = 1/2

Thus, 3/4 × 2/3 = 1/2

-TheUnknownScientist

7 0
3 years ago
Read 2 more answers
Other questions:
  • What is the solution to the equation <br> 13×3/4+x=7(1/4)
    12·1 answer
  • Evaluate the expression a divided by b for a=24 and b=3
    9·1 answer
  • Please i really need help!​
    12·1 answer
  • A number decreased by 23 is 44. Find the number.
    5·2 answers
  • 1. Is the function g(x) increasing or decreasing over the interval -2 &lt; x &lt;-1?
    11·1 answer
  • What's 2/3 written as a fraction with a denominator of 9?<br> A.2/9<br> B.3/9<br> C.6/9<br> D.9/9
    9·1 answer
  • What number times itself gives 256
    13·2 answers
  • Alex drives at an average speed that is
    6·1 answer
  • For a lower tail hypothesis test with a sample size of 10 and a .10 level of significance, the critical value of the test statis
    5·1 answer
  • [PLEASE ANSWER ASAP] The entrance fee to a circus for a child is RM(3x-y). The entrance fee for an adult is RM2y more than the e
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!