Answer:
1) Yes, Publisher relation should have a publisherID primary key.
2) NOT NULL and UNIQUE for the BookID, BranchID, CardNumber and name of the borrower in the Book, Book_Copies, Library_branch, and Borrower relations respectively. The DueDate field of the book_loan relation must be a time constraint. The BookID of the Book relation must be serial number for automatic addition and update of bookid across the database.
Explanation:
The Publisher relation should have primary key publisherID which should replace the publisherName in the Book relation to easily make a join query and attain a third-level database model.
Answer:
c. open the file, read/write/save data, close the file
Explanation:
Answer:
Line second and third i.e, "typing the cell name, like "B4" and clicking the cell to reference
" the correct answer.
Explanation:
It relates to some kind of set of cells on the worksheet, which could be used to calculates the formula. It also helps to locate the information, which you want to analyze in the calculation. It can also provide the cell reference in more than one formula in the same worksheet, that relates to Information on many other workbooks, and wrong choices can be described as follows:
- Hovering provides the basic details, in which we hover, that's why it is wrong
.
- Zooming is used in projection, it can't be used in the cell reference, that's why it is wrong.
Answer:
- def ending_time(hour, minutes, seconds, work_time):
- if((seconds + work_time) // 60 > 0):
- minutes = minutes + (seconds + work_time) // 60
- seconds = (seconds + work_time) % 60
-
- if(minutes // 60 > 0):
- hour = hour + (minutes // 60)
- minutes = minutes % 60
- else:
- seconds = seconds + work_time
-
- return str(hour) + ":" + str(minutes) + ":" + str(seconds)
-
- print(ending_time(2,30,59, 12000))
Explanation:
The solution code is written in Python 3.
Firstly create a function ending_time that takes the four required input parameters.
Next, create an if statement to check if the numerator of (seconds + work_times) divided by 60 is over zero. If so, increment the minute and reassign the remainder of the seconds to the variable (Line 2-4).
Next, create another if statement again to check if the numerator of (current minutes) divided by 60 is over zero, if so increment the hour and reassign the remainder of the minutes to the variable (Line 6-8)
Otherwise, just simply add the work_time to the current seconds
At last return the time output string (Line 12).