Y=25x+350
y=67x+25x or y=92x
x is the amount of days because y is the total
92x=25x+350 This equation will be how many days the cost will be equal
67x=350
<span>x=5.223</span>
Answer:
Congruent
Step-by-step explanation:
There are 2 angles and a side that are congruent in both triangles. Therefore, they are congruent through AAS.
There are 14 times in the table. Add up all 14 times, and divide the sum by 14. The result is the "mean 100-meter sprint time," assuming that you've rounded this off to the nearest tenth of a second.
Answer: 0.4667
Step-by-step explanation:
According to 68–95–99.7 rule , About 99.7% of all data values lies with in 3 standard deviations from population mean (
).
Here , margin of error = 3s , where s is standard deviation.
As per given , we have want our sample mean
to estimate μ μ with an error of no more than 1.4 point in either direction.
If 99.7% of all samples give an
within 1.4 , it means that

Divide boths ides by 3 , we get

Hence, So
must have 0.4667 as standard deviation so that 99.7 % 99.7% of all samples give an
within 1.4 point of μ .
Answer:
There are 29 triangles when you count them all including non obvious ones.