"A construction company is stringing up signs ... "
Divide 4 miles by 1/8 mile:
4 miles
--------------------------- = 32 signs are needed
(1/8) mile per sign
Answer:
I have gotten 216/61, but I am not sure if this is right.
Step-by-step explanation:
By using the "Keep It, Change It, Flip It" tactic, I was able to come up with an answer and simplify it.
1. Keep the original divisor.
162/3
2. Change the sign.
Division becomes multiplication.
3. The last fraction is reciprocated.
61/4 becomes 4/61.
Answer: the answer is linear
Step-by-step explanation: (not sure what functions it’s talkin about but it is linear)
Answer:
Rachel
Step-by-step explanation:
We need to measure how far (towards the left) are the students from the mean in<em> “standard deviations units”</em>.
That is to say, if t is the time the student ran the mile and s is the standard deviation of the class, we must find an x such that
mean - x*s = t
For Rachel we have
11 - x*3 = 8, so x = 1.
Rachel is <em>1 standard deviation far (to the left) from the mean</em> of her class
For Kenji we have
9 - x*2 = 8.5, so x = 0.25
Kenji is <em>0.25 standard deviations far (to the left) from the mean</em> of his class
For Nedda we have
7 - x*4 = 8, so x = 0.25
Nedda is also 0.25 standard deviations far (to the left) from the mean of his class.
As Rachel is the farthest from the mean of her class in term of standard deviations, Rachel is the fastest runner with respect to her class.
Answer:
0.375
Step-by-step explanation:
go on google and search up "45 divided by 120" then you should have your answer lol