The 10 tons should have 37.9% cement.
Let the 25% mixture be x tons
Then the 68% mixture will be (10 -x) tons.
Using formula for mixtures:
Let p for percentage and w for weight in tons.
p₁w₁ + p₂w₂ = pw
25*x + 68*(10-x) = 37.9*10
25x + 680 - 68x = 379
680 - 43x = 379
680 - 379 = 43x
301 = 43x
43x = 301
x = 301/43
x = 7
Recall that x, was for the 25% mixture, 7 tons.
a) For the 68% mixture, = 10 - x = 10 -7 = 3 tons.
b) For the 25% mixture = x = 7 tons.
Answer:
idfk Imao
Step-by-step explanation:
try working on drawing it out and then finding the with x hype
Step-by-step explanation:
pool = 1600 sq.cm
1600 sq.sm = 50cm × 32cm
AB = 50cm
the area of the park of A'B' :
50cm×4=200 sq.cm
B=number of ticets sold before
a=number of tickets sold after
cost of a ticket=number of tickets times cost per ticket
beforecost=39.95b
aftercost=54.95a
total cost=925000
39.95b+54.95a=925000
total number tickets=20000
b+a=20000
we have
39.95b+54.95a=925000
b+a=20000
multiply second equation by -39.95 and add to first equatin
39.95b+54.95a=925000
<u>-39.95b-39.95a=-799000 +</u>
0b+15a=126000
15a=126000
divide bot sides by 15
a=8400
sub back
b+a=20000
b+8400=20000
minus 8400 both sides
b=11600
11,600 tickets sold before
8400 tickets sold after
Answer:
<h2>it will take 30 minutes</h2>
Step-by-step explanation:
obtain a formula
<h3>=> M = $0.10($p)+$25</h3>
<u>insert the value of p dollars</u>
<h3>=> M = $0.10(50) + 25</h3>
<u>multiply 50 by 0.10</u>
<h3>=> M = $5 + 25</h3>
<em> </em><u>add 25 + 5</u>
<h3><em><u>=></u></em> M = $30</h3>
<u>So it takes 30 minutes for international minutes</u> <em><u>Thank </u></em><em><u>You</u></em>
^_^